Phase 1 Discussion Board Schedule and Cost arrest Techniques - Essay ExampleAfter this survey we draw to analyze the gathered data from the survey. This analysis electric ray phase provides only required information for our picture seclude and cost estimation. After this analysis wedge heel phase next comes the design sub phase of the project in which we have to design solely events and process that are necessary for the completion of this project. In this phase we also demine expected expenditure, estimate period required, and main events of the up gradation project. Then next phase is Executing Phase. Here we hire a software development team for the implementation of this new upgraded email system, now our project team completes the plough related to all aspects of this up-gradation.Here an impotent phase is controlling phase that will run in a parallel personal manner with all other phases. In this phase we control the time, cost, manpower required, resources necessita te and all things that are associated with is project. We analyze all the ways like project is running on time, is both module required additional time, then managing time in such a way that additional time is not required. Cost and expenditure monitoring is done in such a way that no extra resources will be needed along the way. Then the last and final phase would be Closing Phase here we have to ensure that the project work is complete successfully, we have to confirm and verify that the deliverables and then completed out the project finances, panel reports, and lessons learned are all documented and analyzed that all thing are well and new email system is working(a) properly.Cost estimation is one of main and difficult part of any project (Chamoun, 2006). All project depends on this estimation, if this estimation goes wrong then lot of complexities might occur during the project. So in our e-mail Up-gradation project we have to estimate the cost in such a way that no complici ty backside happen, and project can be completed successfully. As a project manger it is my
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment